Project № 15
The Settlement of  Mozhaisky (Krasnoselsky District)
1.Developer of project:
“LENGAS”, the City Gas Company of St. Petersburg,  20,
Tchaikovskogo Ul., tel +(812) 273 08 92;
info: Anatoly G. MATVEEV;
2.Investment Project “Gasification of the Settlement of Mozhaisky”;
3.Population: current, 735; a future estimate, 735; A connecting gas pipeline (design length) 1/0 km; the (design) length of the outer gas pipelines: 7.6 km;
4. Project efficiency indicator:

Estimated cost of project- and construction-and-assembly work: 1.0 million USD. An estimated pay-back period : 6 to 8 years;
5. Sourses of financing structure:
investments;
6.Project realization period:
1,5 years;
7.Currently available are: a gas distribution scheme, designing estimates for all the construction-and-assembly works. 